MEG Saturation Monitoring
- Status:
- Complete
- Project Reference Number:
- NIA_NGGD0089
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- Network Innovation Allowance
- Technology:
-
- Gas Distribution Networks
- Expenditure:
- £523,847
Summary
Documents
The scope of work for the project includes:
- Creation of MEG gas test rig including consideration of ATEX related issues when use with Natural Gas.
- Testing and adaption of sample tube and Owlstone methods on the test rig.
- Testing and comparison of the updated approaches on National Grid’s gas distribution network.
- Purchasing one further Owlstone unit (to give two in total) and integrating both units into robust packaging for on-site use.
- EMC testing of updated Owlstone design if an OEM approach used to improve packaging. Report outlining work, results and recommendations.
Benefits
- Identified improvements to the existing methodology that could be implemented and lead to improvement in results.
- Successful demonstration of Owlstone rig giving accurate MEG saturation test results.
Similar projects
No Power Hot Water Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
ACE (Advanced Condensing Exchanger) – Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
Hydrogen Deblending in the GB Gas Network.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance